skip to Main Content
CALL (03) 8360 8910

Supplying projects big and small.

Many of Australia’s largest infrastructure projects have utilised equipment sourced from Dynamic Rigging Hire, we have supplied the Melbourne Metro Tunnel project from the very early pre works days through to final station fit outs and site remediation with everything from TBM assembly, tunnel construction, escalator installations and architectural steel installation.

Some projects have very unique equipment needs, we supplied the Adelaide CUF (Techport defence marine facility) with eight 75t steel tracked load skates especially brought in from the USA by air freight to be used inverted as a conveyor type of load moving application.

John Holland called upon our supply capacity in 2024 to supply eight 20t chain blocks each with a 25t load cell to support a live sewer main whilst being excavated beneath, we continue to support this project with rigging gear and crane work boxes.

The Queensbridge Building is a 66 level in an iconic Melbourne location, we supported the builder with one of our specialist winches that was used on a number of times to safely raise the lift shaft protection deck. The 4.5t winch is the ideal solution as it can be lifted by tower crane to a loading dock and brought into the appropriate floor level, we supply sheaves and anchor plated to divert the winch wire and the entire process to raise the deck is completed in a morning with Dynamic looking after all the mobilisation to and from site working with firm loading dock time spots.

RECENT PROJECTS

  • North East Link
  • Metro Tunnel CYP
  • West Gate Tunnel Project
  • Western Sydney International Airport
  • Adelaide Common User Facility (Techport)
  • Hobsons Bay Main Upgrade Project
  • Chadstone Shopping Centre Expansion
  • NEXTDC Tullamarine
  • The Queensbridge Building

To discuss your lifting and rigging equipment on (03) 8360 8910

Back To Top