skip to Main Content
CALL (03) 8360 8910

Monorail Proof Load Test at Metro Tunnel

Dynamic Rigging Hire was recently called upon to provide steel test weights, rigging, and load cells to proof load test a monorail in the Melbourne Metro Tunnel. The load test required both hoists to be simultaneously load-tested, with full travel amongst the scope of test criteria to achieve the specific load test weights. We provided four separate stacks of steel weights lifted by spreader beams with a 25t Straightpoint tension load cell placed between the crane hook and the top rigging gear to measure the testing works accurately.

To learn more or to make a booking call us on (03) 8360 8910.

Back To Top